English > Business > Processing and manufacturing > Lining machine > Shitai railway tunnel

Shitai railway tunnel

2024年10月09日     39人浏览

The Shitai Railway Tunnel passes through Xiao Mountain, the main peak of Taihang Mountain at an altitude of 1311 meters, with a maximum buried depth of 445 meters and the distance between the two lines is 35 meters. The downward line is 27,839 meters and the upward line is 27,848 meters. The tunnel is constructed by double-line lining machine.