The Kangsu Tunnel of Kashgar Highway is 590 meters long, located in the ridge, with the height difference of 60 meters, the entrance and exit slope are steep, and the top of the cave is gentle.
The tunnel is designed to travel at 80 km/h, which is a two-lane tunnel. The construction adopts double-line lining machine, which is constructed by China Railway 11th Bureau.