No.4 bridge platform 0 T Jane beam overall structure about 4cm amplitude longitudinal migration phenomenon, lead to the gap between the bridge and plate beam is too small, can not meet the requirements of normal bridge structure telescopic, basin support also showed signs of pressure bias, the position using synchronous parallel jacking reset technology for the overall structure of 5cm reset then using synchronous jacking technology change fixed form basin support.