The project is located in Yongchang County, Jinchang City, Gansu Province, with a total investment of 2.35 billion yuan. The altitude is 1688m~1750m, covering an area of 8634 mu, among which the photovoltaic area is 8327 mu, and the land area of the booster station is 30 mu.