Toksun 90MW large-scale ground power station project, located in the Photovoltaic Park of Toksun County, Turpan region, Xinjiang, was officially connected to the grid in December 2014. The installed capacity of the project is 90MW, using more than 300,000 Trina polysilicon modules, covering an area of about 3538 mu. It is the first photovoltaic power plant in Toksun County, and also the photovoltaic power plant with the largest one-time installation capacity at present.