The project plans to invest 1.2 billion yuan to install 36 typhoon electric units with a total capacity of 200MW, build a 220kV booster station with an outlet scale of one time, and tentatively build an energy storage station, which is the first integrated project of source, network and storage in Qinhuangdao city. After the completion of the project, the annual generating capacity will be 472 million kWh, which will comprehensively optimize and integrate the resources of power side, power grid side, load side, and energy storage side of the city. It participates in power grid operation and market transaction through the integrated aggregation mode. In principle, it will not occupy the peak regulation capacity of the system, and will give full play to the load side regulation capacity to achieve independent peak regulation and local consumption.