The project is located in the east of the sea area in Jinhe Town, Xuwen County, Zhanjiang City, with a water depth range of 10m~20m, and the offshore distance of the site center is about 20~35km. A 220kV offshore booster station is built, which is connected to the onshore centralized control center by a 220kV composite Marine cable.